Yearly archives: 2015


Score, another one in my career. I worked as AGL specialist “Works Supervisor” for the renovation of the runway 16L/34R in Fiumicino Airport (Rome) Italy. All the works consisted in: renovation of whole pavement of the taxiway “Delta”: renovation of whole the AGL of the Taxiway “Delta” including: center line […]

Runway 16L/34R renovation – Fiumicino (RM) Italy


            Plant view Date: 2011 Customer: “GTA S.r.l.” – Company specialized in construction, management and maintenance of all types of water treatment plants Subject:  Restoration and expansion of wastewater treatment plant in “Genna” (Perugia) – Italy   Constructive Project of Electrical Systems: Electrical Substation 20kV/400V; […]

Wastewater treatment plant – Genna (Perugia) Italy


  Date: 2010 Customer: “TOTAL” Subject: JET-A1 Fuel Depot for TOTAL in “CIAMPINO” AIRPORT (Rome) – Italy   Detailed Project of Piping Systems: Fuel piping Electrical System: Lightning Protection System and Grounding System. Electrical Main Distribution 400V; Panel boards 400V; Electrical Power System; Lighting System; Access Control system; Anti-Intrusion system; […]

Fuel Depot for Total



AGL Loads Calculation One day someone asked me about electrical calculation for the “AGL” – Airfield Ground Lighting. I didn’t know what answer immediately. Therefore, as usual, I started my own search about electrical calculation for the AGL in order to understand as much as possible and explain the argument […]

AGL Loads Calculation


Flying in the rain. The weather was fun, lots of cloud showing the thermals and the wind rising up the mountains. I took off with the glider Mono ASTIR SC. I was having a very enjoyable fly, but then it started to rain. I tried to escape without success … […]

Flying in the rain


Flying with my friend and instructor Claudio Pelos. After a little training flight in the morning, I was ready for a solo flight in the afternoon, when Claudio asked me if I would go flying with him. We fitted out the glider DG 500 I-IVSB with all our equipment and […]

Flying with Claudio



One of my first project at Fiumicino Airport was the improvement of the RWY 34L Holding Bay. I and my colleague Alessandro Allegrucci had to develop two new holding position for aircraft ICAO category “F” (Airbus A380). One of the problem was find the right position for the “RGL” Runway […]

“RGL” Runway Guard Lights installation


This is my own reproduction of “Sierra” a very old model sold by Cremona Model during the years 80s. The fuselage was made by PVC and the wing was made by polystyrene covered with a sheet of balsa wood. After it was broken during one of my crazy flight I […]

Calabrone




It was my wife that gifted me a new radio control for my birthday on our first year of marriage, therefore I started to built this model after 10 years of pause. This is a reproduction of the L19 Bird Dog. General characteristics of the real Aircraft Crew: one/two Length: […]

L19 Bird Dog