Date: |
2014 – 2015 |
Customer: |
“ADR Engineering S.r.l.” |
Subject: |
Remote Apron for N.3 aircrafts ICAO Category “C” and n.6 aircrafts ICAO Category “E” – Fiumicino Airport (Rome) – Italy” |
|
Detailed Project of:
Electrical systems:
- Electrical Substation 20kV/400V for feeding Apron equipment;
- Lightning Protection System and Grounding System;
- Electrical Main Distribution 400V;
- Panel boards 400V;
- Electrical Power System;
- Lighting System;
- Access Control System;
- Anti-Intrusion System;
- CCTV System;
- Fire Detection System;
- Service Telephone and Data Network;
Airport Apron Systems:
- Airfield Lighting Systems;
- 400Hz ground Power Units including Pits;
- Preconditioned Aircraft Systems including Pits;
- Visual Docking Guidance Systems;
- Apron floodlighting with LED Floodlights;
- Apron Management System and Control & Monitoring System for Apron equipment;
|
Position held: |
Designer |
Amount of works: |
€ 8.000.000,00 – Electrical Systems and Airport Apron Systems |
I can’t show drawing examples, because the work must be subcontracted yet.