Date: 2009
Customer: “Arch. Carlo Formichi”
Subject: Cathedral of Benghazi – Libya
 
Detailed Project of
Electrical System:
  • Electrical Substation 20kV/400V;
  • Lightning Protection System and Grounding System.
  • Electrical Main Distribution 400V;
  • Panel boards 400V;
  • Electrical Power System;
  • Lighting System;
  • Access Control System;
  • Anti-Intrusion System;
  • CCTV System;
  • Fire Detection System;
  • Emergency Call System;
  • Service Telephone and Data Network.
Position held: Designer
Amount of works: € 1.500.000,00 – Electrical Systems

 

Date: 2009
Customer: “Arch. Carlo Formichi”
Subject: Cathedral of Benghazi – Libya
  Detailed Project of

Electrical System:

  • Electrical Substation 20kV/400V;
  • Lightning Protection System and Grounding System.
  • Electrical Main Distribution 400V;
  • Panel boards 400V;
  • Electrical Power System;
  • Lighting System;
  • Access Control System;
  • Anti-Intrusion System;
  • CCTV System;
  • Fire Detection System;
  • Emergency Call System;
  • Service Telephone and Data Network.
Position held: Designer
Amount of works: € 1.500.000,00 – Electrical Systems