Date: |
2010 |
Customer: |
“TOTAL” |
Subject: |
JET-A1 Fuel Depot for TOTAL in “CIAMPINO” AIRPORT (Rome) – Italy |
|
Detailed Project of
Piping Systems:
Electrical System:
- Lightning Protection System and Grounding System.
- Electrical Main Distribution 400V;
- Panel boards 400V;
- Electrical Power System;
- Lighting System;
- Access Control system;
- Anti-Intrusion system;
- CCTV system;
- Fire Detection System;
- Emergency Call System;
- Service Telephone and Data Network;
- Public Information and Announcement Systems.
|
Position held: |
Designer
Works Supervisor |
Amount of works: |
€ 127.000,00 – Piping Systems
€ 153.000,00 – Electrical Systems |
Concrete base and manholes after the installation of underground tanks
Fuel Depot overview
Visual control and drainage section
Fuel downloading section – Flowmeter
Fuel loading section, filter millipore and flowmeter