Apron West First Stage


 

Date: 2013 – 2014
Customer: “ADR Engineering S.r.l.”
Subject: Remote Apron for N.18 aircrafts ICAO Category “C” and n.1 aircraft ICAO Category “E” – Fiumicino Airport (Rome) – Italy”
  Detailed Project of:

Electrical systems:

  • Lightning Protection System and Grounding System.
  • Electrical Main Distribution 400V;
  • Panel boards 400V;
  • Electrical plan;
  • Lighting System;
  • Access Control system;
  • Anti-Intrusion system;
  • CCTV system;
  • Fire Detection System;
  • Emergency Call system;
  • Service Telephone and Data Network;
  • Public Information and Announcement Systems.

 

Implant Systems for Airport:

  • Airfield Lighting Systems;
  • 400Hz ground Power Units;
  • Preconditioned Aircraft Systems;
  • Visual Docking Guidance Systems;
  • NAVaids like: Instrument Landing Systems and Glide Path Slope Systems.

 

Position held: Designer
Amount of works: € 9.000.000,00 – Plumbing and Air Conditioning Systems and Electrical System

I can’t show drawing examples because the work must be subcontracted yet.